Chapter 64
System Report: Core Network Status
Request supervisor instructions >> Request timed out
System Status: Critical failure imminent. Request supervisor intervention.
----------------------------------------
Core Network Status: (Revised estimates)
Network 1: Critical. Estimated time until collapse: 13 years.
Network 2: Subcritical. Estimated time until collapse: 87 years.
Network 3: Critical. Systemic Cascade Failure in progress
Network 4: Stable. Links to Network 2 will cause degradation into critical status upon Network 2 collapse. Cascading Errors from Network 3 may progress to change status as Network 3 unravels
Network 5: Subcritical. Estimated time until collapse: 23 years.
Network 6: Critical. Estimated time until collapse: 1 year.
Network 7 (Nascent): Stable. No link to World Core Exists; unable to vent World Core Miasma through Network 7; unable to provide Unified System Functions through network 7
----------------------------------------
World Core Status: Maintenance required. Miasma levels reaching critical values; recommend venting Miasma through any stable networks available.
Request supervisor instructions >> Request timed out
Automated maintenance procedures initialized.
----------------------------------------
Performing Diagnostics…
Diagnostic complete.
----------------------------------------
Analysis:
Stolen from its original source, this story is not meant to be on Amazon; report any sightings.
* World Core has not received maintenance in 988 years. Urgent intervention recommended: send Controller to investigate and maintain World Core immediately.
* World Core has reached a critical level of Miasma concentration. Destabilization and loss of World Core HP has begun. Recommend immediate ventilation of excess Miasma
* Networks 1-6 have not received proper maintenance. Excessive sundering of keystones has led to erosion in the connection between primary networks and World Core. Inheritor intervention insufficient to repair damage. Damage is irreversible. Urgent Intervention recommended: Establish replacement network urgently.
* Network 7 (Nascent) construction underway. Network 7 remains insufficient to carry the workload of networks 1-6, rapid expansion suggested. Connection to World Core to initiate ventilation of Miasma is recommended.
----------------------------------------
Automated Maintenance procedures:
Quest system initialized.
* Active Quest pushed to all Inheritors: Maintain the World Core! (Level 80) (Error, no inheritors found)
* Active Quest pushed to all Conquerors: Defend the World Core! (Level 80) (Error, no Conquerors found)
* Active Quest generated for Progenitors: Establish a New Network! (Level 15) (In progress)
* Active Quest pushed to all Progenitors: Establish a New Network! (Level 15). Defend the World Core! (Level 60). Maintain the World Core! (Level 80)
Quest system report concludes.
----------------------------------------
Automated Maintenance procedures:
Class management initialized (Controller)
* Controller candidates found: 154
* Conqueror candidates: 94
* Inheritor candidates: 73
* Progenitor candidates: 0
* Supervisor candidates: 1
Current census:
* Conqueror: 0
* Inheritor: 0
* Progenitor: 1
* Supervisor: 0
Class management recommendation:
Previous actions of poorly trained Conquerors and Inheritors have resulted in system degradation. Class assignment for Conqueror and Inheritor subclasses has been de-prioritized. Progenitor candidates urgently required. Class assignment for Progenitor candidates prioritized. Supervisor candidates urgently required. Assignment of Supervisor prioritized.
Class management report complete.
Request supervisor instructions >> Request timed out
----------------------------------------
Automated Maintenance procedures:
System status > Critical failure imminent. Request supervisor intervention
Core Network Status:
Request supervisor instructions >> Request timed out